Prime Contractor Head-to-Head Analysis
SIKORSKY AIRCRAFT CORPORATION vs. NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC
Comparative federal market share, recompete retention probability, agency obligations, and socioeconomic classifications.
Comparison Highlights
Verified SAM.gov & FPDS DataComparing federal prime contracting performance between SIKORSKY AIRCRAFT CORPORATION and NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC: SIKORSKY AIRCRAFT CORPORATION holds $114.88B in lifetime obligations with a 85.6% recompete retention rate, while NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC records $85.55B with a 75.2% retention rate.
•SIKORSKY AIRCRAFT CORPORATION Lifetime Spend: $114.88B
•NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC Lifetime Spend: $85.55B
•SIKORSKY AIRCRAFT CORPORATION Recompete Win %: 85.6%
•NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC Recompete Win %: 75.2%
•SIKORSKY AIRCRAFT CORPORATION Top Agency: Department of Defense
•NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC Top Agency: Department of Energy
Core Procurement Metrics Side-by-Side
Entity A
Full Profile →SIKORSKY AIRCRAFT CORPORATION
Total Lifetime Obligations:$114.88B
Trailing 12M Obligations:$40.21B
Recompete Win Rate:85.6%
Active Prime Task Orders:28
Average Award Cycle:58 Days
Primary Industry (NAICS):541512
Entity B
Full Profile →NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC
Total Lifetime Obligations:$85.55B
Trailing 12M Obligations:$29.94B
Recompete Win Rate:75.2%
Active Prime Task Orders:2
Average Award Cycle:50 Days
Primary Industry (NAICS):541512