Prime Contractor Head-to-Head Analysis

Synergy Engineering Group vs. LOCKHEED MARTIN CORPORATION

Comparative federal market share, recompete retention probability, agency obligations, and socioeconomic classifications.

Comparison Highlights
Verified SAM.gov & FPDS Data

Comparing federal prime contracting performance between Synergy Engineering Group and LOCKHEED MARTIN CORPORATION: Synergy Engineering Group holds $20.8M in lifetime obligations with a 75.1% recompete retention rate, while LOCKHEED MARTIN CORPORATION records $394.04B with a 86.4% retention rate.

•Synergy Engineering Group Lifetime Spend: $20.8M
•LOCKHEED MARTIN CORPORATION Lifetime Spend: $394.04B
•Synergy Engineering Group Recompete Win %: 75.1%
•LOCKHEED MARTIN CORPORATION Recompete Win %: 86.4%
•Synergy Engineering Group Top Agency: Federal Aviation Administration
•LOCKHEED MARTIN CORPORATION Top Agency: Department of Defense

Core Procurement Metrics Side-by-Side

Entity A

Synergy Engineering Group

Full Profile →
Total Lifetime Obligations:$20.8M
Trailing 12M Obligations:$7.5M
Recompete Win Rate:75.1%
Active Prime Task Orders:17
Average Award Cycle:41 Days
Primary Industry (NAICS):541810
Entity B

LOCKHEED MARTIN CORPORATION

Full Profile →
Total Lifetime Obligations:$394.04B
Trailing 12M Obligations:$137.91B
Recompete Win Rate:86.4%
Active Prime Task Orders:91
Average Award Cycle:42 Days
Primary Industry (NAICS):541512
Custom Matchup Builder

Compare Any Two Federal Contractors Side-by-Side

8,499+ SAM.gov prime contractors indexed
Prime Contractor A
Synergy Engineering Group
UEI: 1Q0116SJ5JNW • Washington, NJ
VS
Prime Contractor B
LOCKHEED MARTIN CORPORATION
UEI: G4KDGE4JFFK7 • Washington, TX