Prime Contractor Head-to-Head Analysis
TECHNICAL AND PROJECT ENGINEERING, LLC vs. LOCKHEED MARTIN CORP
Comparative federal market share, recompete retention probability, agency obligations, and socioeconomic classifications.
Comparison Highlights
Verified SAM.gov & FPDS DataComparing federal prime contracting performance between TECHNICAL AND PROJECT ENGINEERING, LLC and LOCKHEED MARTIN CORP: TECHNICAL AND PROJECT ENGINEERING, LLC holds $95.4M in lifetime obligations with a 83.7% recompete retention rate, while LOCKHEED MARTIN CORP records $154.66B with a 93.3% retention rate.
•TECHNICAL AND PROJECT ENGINEERING, LLC Lifetime Spend: $95.4M
•LOCKHEED MARTIN CORP Lifetime Spend: $154.66B
•TECHNICAL AND PROJECT ENGINEERING, LLC Recompete Win %: 83.7%
•LOCKHEED MARTIN CORP Recompete Win %: 93.3%
•TECHNICAL AND PROJECT ENGINEERING, LLC Top Agency: Department of Defense
•LOCKHEED MARTIN CORP Top Agency: Department of Defense
Core Procurement Metrics Side-by-Side
Entity A
Full Profile →TECHNICAL AND PROJECT ENGINEERING, LLC
Total Lifetime Obligations:$95.4M
Trailing 12M Obligations:$33.4M
Recompete Win Rate:83.7%
Active Prime Task Orders:2
Average Award Cycle:44 Days
Primary Industry (NAICS):541511
Entity B
Full Profile →LOCKHEED MARTIN CORP
Total Lifetime Obligations:$154.66B
Trailing 12M Obligations:$54.13B
Recompete Win Rate:93.3%
Active Prime Task Orders:28
Average Award Cycle:39 Days
Primary Industry (NAICS):541512